HUTCHISON
Ports
has struck a deal with the Ports of Stockholm to operate the
new container terminal that is currently under construction at Norvik
Port. The new terminal is scheduled to open in 2020.
As
the only deep-water container facility on the east coast of Sweden,
the new terminal has a 450-metre quay and a
depth of 16.5-metre. Future expansion will allow capacity levels to
meet 450,000
TEU annually, the American Shipper cited Hutchinson
Ports as saying.
Hutchinson
Ports has operated the Container Terminal Frihamnen in
Stockholm since 2009. Once the new terminal opens, the Frihamnen will be
redeveloped by the Ports of Stockholm for residential and amenity purposes.
Source
: HKSG.
Tidak ada komentar:
Posting Komentar